Medical Engineering Company W.L.L

  •  +965 22084646
  •   Plot C20, Kuwait Free Trade Zone Shuwaikh , Kuwait

1978

Arabi Enertech KSC (formally known as Abdul Aziz Yousuf Al-Essa & Co.) was incorporated in 1978 as a medical engineering company engaged in providing complete range of services to Ministry Of Health and Private Hospitals. During that year, a prestigious Amiri Hospital  equipping contract was awarded with the scope of Engineering, Procurement, Supply, Installation and Maintenance of Operation theaters, CSSD, Imaging Systems, Medical Gas distribution network, Laboratories, Central Kitchen etc.

1982

In 1982, the company became the member of the Arabi Holding Group KSC (listed in Kuwait Stock Exchange).

We maintained an active presence with Ministry Of Health undertaking various supply and installation contracts. We supplied and maintained various equipment like Anesthesia machines, Ventilators, Patient Monitoring System, Infant Incubators, Biochemistry Blood Analyzer, Hematology Analyzer, and Spectrophotometer, etc. manufactured by renowned companies.

2002

Abdul Aziz Yousuf Al-Essa & Co. was renamed as Arabi Enertech KSC in 2002.

2014

In 2014, Arabi Holding Group which is parent company of Medical Engineering Company, won a concession from Govt. Of Kuwait to build the facilities (under a public limited company called DHAMAN) for medical care for over 2.5 Million expats residing in Kuwait, which includes three hospitals of 300 bed each and 15 primary health care center covering the entire state of Kuwait. It includes construction, equipping, operation and maintenance of hospitals and primary health centers for 20 years after the completion of construction. The project is in the implementation stage at present and is expected to complete shortly.

To cater for the enhanced scope of Medicare over a long term, the medical operations of Arabi Enertech was consolidated into a new specialized company namely M/s. Medical Engineering Company W.L.L.

2017

In 2016, the Paid-Up Capital of our company has increased to  KD 15.025 Million  (USD 50 Million).



2023

In 2023, the Ownership of the Company was changed from Arabi Enertech KSC to Arabi Company.


2017

In 2016, the Paid-Up Capital of our company has increased to  KD 15.025 Million  (USD 50 Million).



2023

In 2023, the Ownership of the Company was changed from Arabi Enertech KSC to Arabi Company.